This project will renovate office suite 321D in the Talbot Lab. The work includes seven new faculty offices, each with exterior windows. The office doors and walls around the center workspace will include transoms to
This project included interior renovations to student rooms, offices, common areas, and student bathrooms to meet privacy needs and comply with ADA requirements, as well as exterior renovations to enhance the building envelope’s thermal performance,
This project will resurface the UIUC State Farm Center Northwest Parking Lot. The work involves pulverizing and overlaying the existing parking lot. New sidewalks and ADA parking grading will also be included.
This project will install new, highly insulated roofing at multiple buildings on campus that have exceeded their life expectancy and are a regular maintenance issue. The new roofs will have improved levels of insulation to
This project will replace the existing once-through use of potable/domestic cooling water with a closed-loop chilled-water heat-rejection system for laboratories within the Engineering Science Building. The targeted areas will be the basement, first and second
This project provided for select interior renovations to The Krannert Art Museum Kinkead Pavilion, including the replacement of MEP equipment, upgrades to fire and security systems, and interior wall and ceiling finishes. In addition, exterior
This project will completely restore both the exterior and interior of Altgeld Hall (76,500 GSF), the second-oldest building on campus and listed on the National Register of Historic Places, to a world-class academic enterprise while
‘- This $10M project constructed a new 40,000 SF community center on North Market Street in Champaign, IL. The new building will provide community members with opportunities to meet, play, and learn under one roof,
As part of a Retainer Work Order, this project will provide a state-of-the-art BSL-2 wet lab in the existing shell space in Room 2148 of Everitt Lab, a three-story, semi-flexible building, with bench space to
This project will completely restore the exterior and interior of Altgeld Hall (76,500 GSF), the second-oldest building on campus and listed on the National Register of Historic Places, to a world-class academic enterprise while preserving
This $8.4M project constructed new soccer and track-and-field facilities on the University of Illinois at Urbana-Champaign campus. The new Demirjian Park features two soccer fields—one for competition and one for practice—located east of the track
The new four-story, 135,000 GSF building to be primarily occupied by the University’s Computer Science department will include 16,000 SF of classroom space, an undergraduate learning and community center, dry labs, a robotics lab, flexible
The new Oregon Public Library replaces a downtown facility that was unable to expand in its original location. The new library includes offices, study rooms, meeting spaces, and a community room. The new space also
This project will take 20,000 rentable square feet for the creation of the new National Institute for Theory and Mathematics in Biology (NITMB). This institute will create a nationwide collaborative research community that will generate
‘- This $10M project constructed a new 40,000 SF community center on North Market Street in Champaign, IL. The new building will provide community members with opportunities to meet, play, and learn under one roof,
The Fort HealthCare Operating Rooms was a healthcare project in Fort Atkinson, WI. Completed in 2010, the 60,000 sq. ft. plan had an estimated budget of $10,000,000. This project included a renovation of the O/R
The Milwaukee VA Fisher House was a healthcare project in Milwaukee, WI. Completed in 2014, the 20,000 sq. ft. plan had an estimated budget of $800,000. Provided Value Engineering and Cost Estimating services for the
The Wisconsin Veterans Home was a healthcare project in Chain O’ Lakes-King, WI. Completed in 2014, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Cost Estimating for the pedestrian circulation study,
The Madison VA IDIQ was a healthcare project in Madison, WI. Completed in 2014, the in excess of 100,000 sq. ft. plan had an estimated budget of $10,000,000. Provided Cost Estimating services for $15 Million
The Madison VA Medical Center was a healthcare project in Madison, WI. Completed in 2014, the In excess of 100,000 sq. ft. plan had an estimated budget of $10,000,000+. Engaged by the design team. Provided
The Tomah VA Medical Center was a healthcare project in Tomah, WI. Completed in 2014, the 20,000 sq. ft. plan had an estimated budget of $400,000. Provided critical path schedules for the design team on
The Syracuse VA Medical Center was a healthcare project in Syracuse, NY. Completed in 2015, the 20,000 sq. ft. plan had an estimated budget of $9,000,000. Throughout the development and construction design phases of the
The Milwaukee VA Generator was a healthcare project in Milwaukee, WI. Completed in 2015, the 1,200 sq. ft. plan had an estimated budget of $4,000,000. This project consisted of the addition of Building 144’s Generator
The Milwaukee VA Medical Center was a healthcare project in Milwaukee, WI. Completed in 2015, the 15,000 sq. ft. plan had an estimated budget of $2,300,000. Worked with the Owner and Contractor to provide cost
The Madison VA ICU was a healthcare project in Madison, WI. Completed in 2015, the 30,000 sq. ft. plan had an estimated budget of $8,000,000. Provided General Contracting services for the $8 Million ICU consolidation
The St. Joe’s Medical Center was a healthcare project in Hobart, Indiana. Completed in 2015, the 60,000 sq. ft. plan had an estimated budget of $23,000,000. Provided Feasibility Studies and Cost Engineering Solutions for the
The Ann Arbor VA Medical Center was a healthcare project in Ann Arbor, MI. Completed in 2016, the 40,000 sq. ft. plan had an estimated budget of $7,800,000. Provided Cost Estimating services and phasing review
The Amarillo VA Medical Center was a healthcare project in Amarillo, TX. Completed in 2016, the 45,000 sq. ft. plan had an estimated budget of $8,000,000. Provided Value Engineering and Cost Estimating services for all
The Prescott VA Medical Center was a healthcare project in Prescott, AZ. Completed in 2016, the 2,000 sq. ft. plan had an estimated budget of $3,400,000. Provided Feasibility Studies and Cost Estimating services for the
The Fort HealthCare Hospital was a healthcare project in Fort Atkinson, WI. Completed in 2019, the 400,000 sq. ft. plan had an estimated budget of $100,000,000. Campus Regeneration Study: Provided Conceptual Cost Estimates for the
The McCalmont Residence Hall Renovation was an education project in Stout, WI. Completed in 2014, the 67,000 sq. ft. plan had an estimated budget of $7,900,000. This project at University of Wisconsin – Stout, included
The UW Whitewater Residence Halls was an education project in Whitewater, WI. Completed in 2015, the 108,000 sq. ft. plan had an estimated budget of $12,000,000. This project consisted of the renovation of multiple student
The Pike River Dormitory was an education project in Kenosha, WI. Completed in 2009, the 120,000 sq. ft. plan had an estimated budget of $12,000,000. Provided Cost Estimating and Bidding services to the general contractor
The UW Hospital Parking Ramp was an education project in Madison, WI. Completed in 2015, the 130,000 sq. ft. plan had an estimated budget of $26,000,000. This project consists of an expansion to the UW
The UW Lacrosse Utility Building was an education project in Lacrosse, WI. Completed in 2016, the 6,540 sq. ft. plan had an estimated budget of $2,500,000. Provided Cost Estimating services for the addition and expansion
The UW Parking Expansion was an education project in La Crosse, WI. Completed in 2016, the 120,000 sq. ft. plan had an estimated budget of $7,600,000. The University of Wisconsin was granted permission to add
The Debot Hall Dining Facility was an education project in Stevens Point, WI. Completed in 2018, the 56,820 sq. ft. plan had an estimated budget of $10,000,000. Provided Cost Estimating services for the study of
The UW School of Engineering was an education project in Platteville, WI. Completed in 2020, the 400,000 sq. ft. plan had an estimated budget of $60,000,000. Provided Cost Estimating services and Value Engineering options for
The University of Illinois at Chicago Engineering Innovation Building was an education project in Chicago, Illinois. Completed in 2019, the 57,500 sq. ft. plan had an estimated budget of $31,893,950. For students of the engineering,
The UW Milwaukee Chemistry Building & Central Utilities Expansion was an education project in Milwuakee, Wisconsin. Completed in 2022, the 155,340 sq. ft. plan had an estimated budget of $129,535,000. This project constructs a new
The UW Milwaukee Klotsche Center Annex Addition was an education project in Milwaukee, Wisconsin. Completed in 2022, the 17,342 sq. ft. plan had an estimated budget of $5,927,091. This project constructs a new one-court gymnasium
The UIC Computer Research Design and Learning Center was an education project in Chicago, Illinois. Completed in 2022, the 135,000 sq. ft. plan had an estimated budget of $76,336,168. This project will construct a new
The UW Madison’s Meat Science and Animal Biologics Discovery Building was an education project in Madison, Wisconsin. Completed in 2020, the 72,784 sq. ft. plan had an estimated budget of $36,088,175. University of Wisconsin Madison’s
The UW Madison Sellery & Witte Residence Halls Renovation was an education project in Madison, Wisconsin. Completed in 2019, the 287,324 sq. ft. plan had an estimated budget of $52,797,000. Witte Residence Hall, which opened
The UW Madison Chemistry Building Instructional Addition and Renovation was an education project in Madison, Wisconsin. Completed in 2022, the 245,840 sq. ft. plan had an estimated budget of $133,100,000. The project consists of the
The Nicholas Recreation Center was an education project in Madison, WI. Completed in 2020, the 250,800 sq. ft. plan had an estimated budget of $65,871,200 . The Nicholas Recreation Center (Nick) is a new state-of-the-art
The Airport Snow Removal Facility was a municipality project in Madison, WI. Completed in 2013, the 58,800 sq. ft. plan had an estimated budget of $14,000,000. This Green Certified building at the Dane County Regional
The La Crosse Regional Airport was a municipality project in La Crosse, WI. Completed in 2014, the 60,000 sq. ft. plan had an estimated budget of $1,300,000. Provided Cost Estimating services and assisted in bid
The Manhattan Regional Airport was a municipality project in Manhattan, KS. Completed in 2014, the 24,000 sq. ft. plan had an estimated budget of $12,000,000. This $12 Million project included the expansion and renovation of
The Green Bay Airport was a municipality project in Green Bay, WI. Completed in 2015, the 5,700 sq. ft. plan had an estimated budget of $1,700,000. Conducted pre-design feasibility and design estimates for the addition
The DNA Lab, Wisconsin DOJ was a municipality project in Madison, WI. Completed in 2015, the 20,000 sq. ft. plan had an estimated budget of $5,100,000. Provided pre-construction and construction-level estimates for the renovation of
The Madison Municipal Building was a municipal project in Madison, WI. Completed in 2018, the 74,880 sq. ft. plan had an estimated budget of $30,200,00. Home to many of Madison’s essential city employees and listed
The “Deep Space” Auditorium was a commercial project in Verona, WI. Completed in 2013, the 600,000 sq. ft. plan had an estimated budget of $200,000,000. This 11,000-seat auditorium project included preliminary schematic budgets and detailed
The Hilldale Mall was a commercial project in Madison, WI. Completed in 2015, the 60,000 sq. ft. plan had an estimated budget of $6,000,000. Provided Cost Estimating and Value Engineering services for the multi-phased renovation
The Epic Systems, Campus III was a commercial project in Verona, WI. Completed in 2016, the 400,000 sq. ft. plan had an estimated budget of $200,000,000. Provided Conceptual and Schematic Budgets for the Epic Campus
The Illinois State Fair Coliseum was a commercial project in Springfield, Illinois. Completed in 2019, the 44,900 sq. ft. plan had an estimated budget of $10,770,945. Originally constructed in 1901 and listed on the National