This project will take 20,000 rentable square feet for the creation of the new National Institute for Theory and Mathematics in Biology (NITMB). This institute will create a nationwide collaborative research community that will generate
The new four-story, 135,000 GSF building to be primarily occupied by the University’s Computer Science department will include 16,000 SF of classroom space, an undergraduate learning and community center, dry labs, a robotics lab, flexible
This $8.4M project constructed new soccer and track-and-field facilities on the University of Illinois at Urbana-Champaign campus. The new Demirjian Park features two soccer fields—one for competition and one for practice—located east of the track
This project will completely restore the exterior and interior of Altgeld Hall (76,500 GSF), the second-oldest building on campus and listed on the National Register of Historic Places, to a world-class academic enterprise while preserving
As part of a Retainer Work Order, this project will provide a state-of-the-art BSL-2 wet lab in the existing shell space in Room 2148 of Everitt Lab, a three-story, semi-flexible building, with bench space to
‘- This $10M project constructed a new 40,000 SF community center on North Market Street in Champaign, IL. The new building will provide community members with opportunities to meet, play, and learn under one roof,
This project will replace the existing once-through use of potable/domestic cooling water with a closed-loop chilled-water heat-rejection system for laboratories within the Engineering Science Building. The targeted areas will be the basement, first and second
This project will install new, highly insulated roofing at multiple buildings on campus that have exceeded their life expectancy and are a regular maintenance issue. The new roofs will have improved levels of insulation to
This project will resurface the UIUC State Farm Center Northwest Parking Lot. The work involves pulverizing and overlaying the existing parking lot. New sidewalks and ADA parking grading will also be included.
This project will completely restore both the exterior and interior of Altgeld Hall (76,500 GSF), the second-oldest building on campus and listed on the National Register of Historic Places, to a world-class academic enterprise while
This project provided for select interior renovations to The Krannert Art Museum Kinkead Pavilion, including the replacement of MEP equipment, upgrades to fire and security systems, and interior wall and ceiling finishes. In addition, exterior
This project included interior renovations to student rooms, offices, common areas, and student bathrooms to meet privacy needs and comply with ADA requirements, as well as exterior renovations to enhance the building envelope’s thermal performance,
This project will renovate office suite 321D in the Talbot Lab. The work includes seven new faculty offices, each with exterior windows. The office doors and walls around the center workspace will include transoms to
The UW Parking Expansion was an education project in La Crosse, WI. Completed in 2016, the 120,000 sq. ft. plan had an estimated budget of $7,600,000. The University of Wisconsin was granted permission to add
The UW Lacrosse Utility Building was an education project in Lacrosse, WI. Completed in 2016, the 6,540 sq. ft. plan had an estimated budget of $2,500,000. Provided Cost Estimating services for the addition and expansion
The UW Hospital Parking Ramp was an education project in Madison, WI. Completed in 2015, the 130,000 sq. ft. plan had an estimated budget of $26,000,000. This project consists of an expansion to the UW
The Pike River Dormitory was an education project in Kenosha, WI. Completed in 2009, the 120,000 sq. ft. plan had an estimated budget of $12,000,000. Provided Cost Estimating and Bidding services to the general contractor
The UW Whitewater Residence Halls was an education project in Whitewater, WI. Completed in 2015, the 108,000 sq. ft. plan had an estimated budget of $12,000,000. This project consisted of the renovation of multiple student
The McCalmont Residence Hall Renovation was an education project in Stout, WI. Completed in 2014, the 67,000 sq. ft. plan had an estimated budget of $7,900,000. This project at University of Wisconsin – Stout, included
The Nicholas Recreation Center was an education project in Madison, WI. Completed in 2020, the 250,800 sq. ft. plan had an estimated budget of $65,871,200 . The Nicholas Recreation Center (Nick) is a new state-of-the-art
The UW Madison Chemistry Building Instructional Addition and Renovation was an education project in Madison, Wisconsin. Completed in 2022, the 245,840 sq. ft. plan had an estimated budget of $133,100,000. The project consists of the
The UW Madison Sellery & Witte Residence Halls Renovation was an education project in Madison, Wisconsin. Completed in 2019, the 287,324 sq. ft. plan had an estimated budget of $52,797,000. Witte Residence Hall, which opened
The UW Madison’s Meat Science and Animal Biologics Discovery Building was an education project in Madison, Wisconsin. Completed in 2020, the 72,784 sq. ft. plan had an estimated budget of $36,088,175. University of Wisconsin Madison’s
The UW School of Engineering was an education project in Platteville, WI. Completed in 2020, the 400,000 sq. ft. plan had an estimated budget of $60,000,000. Provided Cost Estimating services and Value Engineering options for
The Debot Hall Dining Facility was an education project in Stevens Point, WI. Completed in 2018, the 56,820 sq. ft. plan had an estimated budget of $10,000,000. Provided Cost Estimating services for the study of
The UIC Computer Research Design and Learning Center was an education project in Chicago, Illinois. Completed in 2022, the 135,000 sq. ft. plan had an estimated budget of $76,336,168. This project will construct a new
The UW Milwaukee Klotsche Center Annex Addition was an education project in Milwaukee, Wisconsin. Completed in 2022, the 17,342 sq. ft. plan had an estimated budget of $5,927,091. This project constructs a new one-court gymnasium
The UW Milwaukee Chemistry Building & Central Utilities Expansion was an education project in Milwuakee, Wisconsin. Completed in 2022, the 155,340 sq. ft. plan had an estimated budget of $129,535,000. This project constructs a new
The University of Illinois at Chicago Engineering Innovation Building was an education project in Chicago, Illinois. Completed in 2019, the 57,500 sq. ft. plan had an estimated budget of $31,893,950. For students of the engineering,