This project will replace the existing once-through use of potable/domestic cooling water with a closed-loop chilled-water heat-rejection system for laboratories within the Engineering Science Building. The targeted areas will be the basement, first and second floors of the low-rise, and the basement and first floors of the 6-story high-rise.

