EDUCATION

University of Wisconsin – Parkside,
Pike River Suites Dormitory
Kenosha, WI

Size: 120,000 SF
Cost: $12 Million
Completion Date: 2009

Provided Cost Estimating and Bidding services to the general contractor for the Pike River Suites Dormitory. Additionally, we provided value engineering options to the Owner and Architect to bring the project costs in line with the approved budget.

University of Wisconsin - Whitewater,
Student Residence Halls
Whitewater, WI

Size: 108,000 SF
Cost: $12 Million
Completion Date: 2015

This project consisted of the renovation of multiple student residence buildings dating from the mid 1960's with a focus on code and ADA compliance, circulation and student amenities. Provided Cost Estimating services through all phases of work. Additionally, we provided Value Engineering services.

University of Wisconsin – Platteville,
School of Engineering, Master Plan
Platteville, WI

Size: 400,000 SF
Cost: In excess of $60 Million
Completion Date: 2017-2020

Provided Cost Estimating services and Value Engineering options for the renovation and additions to four academic buildings on the campus.

University of Wisconsin – Stout,
McCalmont Residence Hall Renovation
Stout, WI

Size: 67,000 SF
Cost: $7.9 Million
Completion Date: 2014

This project included an addition and remodel of the freshman residence hall. Provided Cost Estimating and Value Engineering services.

University of Wisconsin – Stevens Point,
Debot Hall Dining Facility
Stevens Point, WI

Size: 56,820 SF
Cost: $10 Million
Completion Date: 2017-2018

Provided Cost Estimating services for the study of the renovation for the Debot Hall Dining Facility.

University of Wisconsin – Lacrosse,
Utility Building
Lacrosse, WI

Size: 6,540 SF
Cost: $2.5 Million
Completion Date: 2016

Provided Cost Estimating services for the addition and expansion of the campus’s chilled water plant.

 

COMMERCIAL

Epic Systems, Campus III - Verona, WI

Size: In excess of 400,000 SF
Total Project Cost: $200 Million
Completion Date: 2016

Provided Conceptual and Schematic Budgets for the Epic Campus III project. The project consisted of six office buildings and two underground parking facilities for the software developer.

Epic Systems, “Deep Space” – Verona, WI

Size: 600,000 SF
Total Project Cost: $200 Million
Completion Date: 2013

This 11,000 seat auditorium project included preliminary schematic budgets and detailed quantity surveys for Epic System's “Deep Space” building.

Hilldale Mall - Madison, WI

Size: 60,000 SF
Cost: $6 Million
Completion Date: 2015

Provided Cost Estimating and Value Engineering services for the multi-phased renovation and expansion of the retail mall.

 

MUNICIPALITIES

Dane County Regional Airport,
Snow Removal Facility
Madison, WI

Size: 58,800 SF
Cost: $14 Million
Completion Date: 2013

This Green Certified building includes a new storage facility for the airport snow removal equipment and includes a geothermal heating/cooling system. Provided Cost Estimating services and a Foundations Cost Analysis.

Green Bay Airport
Green Bay, WI

Size: 5,700 SF
Cost: $1.7 Million
Completion Date: 2015

Conducted pre-design feasibility and design estimates for the addition and renovation of the Green Bay International Airports Customs and Border Protection office.

La Crosse Regional Airport
La Crosse, WI

Size: 60,000 SF (renovation)
Cost: $1.3 Million
Completion Date: 2014

Provided Cost Estimating services and assisted in bid preparation for the exterior renovations and upgrades to the regional airport.

Manhattan Regional Airport
Manhattan, KS

Size: 24,000 SF
Cost: $12 Million
Completion Date: 2014

This $12 Million project included the expansion and renovation to the Manhattan Regional Airport. Provided Cost Estimating services, phasing and feasibly review.

University of Wisconsin Health,
Lot 75 Parking Structure
Madison, WI

Size: 130,000 SF
Cost: $26 Million
Completion Date: 2015

This project consists of an expansion to the UW Hospital Parking Ramp with additions to the south and east side of the existing ramp. Engaged to provide Cost Estimating services.

University of Wisconsin - La Crosse,
Parking Structure Expansion
La Crosse, WI

Size: 120,000 SF
Cost: $7.6 Million
Completion Date: 2016

The University of Wisconsin was granted permission to add two new levels to its new campus parking ramp. Provided Cost Estimating services and Scheduling input for the campus.

Wisconsin Department of Justice,
DNA Lab

Size: 20,000 SF
Cost: $5.1 Million
Completion Date: 2015

Provided pre-construction and construction level estimates for the renovation of the state of the art facility.

 
 
 

HEALTHCARE

Veterans Affairs Medical Center
Syracuse, NY

Size: 20,000 SF
Cost: $9 Million
Completion Date: 2015

Throughout the development and construction design phases of the 4th floor renovation of the community based living center,we provided Cost Estimating services.

Veterans Affairs Medical Center
Ann Arbor, MI

Size: 40,000 SF
Cost: $7.8 Million
Completion Date: 2016

Provided Cost Estimating services and phasing review for the renovation and expansion of the facilities front entrance and outpatient clinic areas.

Veterans Affairs Medical Center
Amarillo, TX

Size: 45,000 SF
Cost: $8 million
Completion Date: 2016

Provided Value Engineering and Cost Estimating services for all phases of the campus’ community based living center.

Veterans Affairs Medical Center
Milwaukee, WI

Size: 1,200 SF
Cost: $4 Million
Completion Date: 2015

This project consisted of the addition of Building 144’s Generator Facility. Provided Cost Estimating services.

Veterans Affairs Medical Center
Milwaukee, WI

Size: 20,000 SF
Cost: $800,000
Completion Date: 2014

Provided Value Engineering and Cost Estimating services for the civil and utility work required for the addition of the Fisher House.

Veterans Affairs Medical Center
Milwaukee, WI

Size: 15,000 SF
Cost: $2.3 Million
Completion Date: 2015

Worked with the Owner and Contractor to provide cost loaded critical path schedules for the multi-phased prosthetics renovation.

Wisconsin Veterans Home at King
Chain O’ Lakes-King, WI

Size: 2,000 SF
Cost: $3.4 Million
Completion Date: 2014

Provided Cost Estimating for the pedestrian circulation study, and subsequent addition and renovation of elevators at (4) of the campuses buildings.

Veterans Affairs Medical Center
Madison, WI

Size: in excess of 100,000 SF of additions and renovations
Cost: in excess of $10 Million
Completion Date: 2014

Provided Cost Estimating services for $15 Million worth of projects during the 2013 IDIQ program.

Veterans Affairs Medical Center
Madison, WI

Size: 30,000 SF
Cost: $8 Million
Completion Date: 2015

Provided General Contracting services for the $8 Million ICU consolidation and expansion project.

Veterans Affairs Medical Center
Madison, WI

Size: In excess of 100,000 SF
Cost: In excess of $10 Million
Completion Date: 2014

Engaged by the design team. Provided critical path schedules on the various projects as part of the 2013 IDIQ.

Veterans Affairs Medical Center
Prescott, AZ

Size: 2,000 SF
Cost: $3.4 Million
Completion Date: 2016

Provided Feasibility Studies and Cost Estimating services for the replacement of campus’ emergency power systems.

Veterans Affairs Medical Center
Tomah, WI

Size: 20,000 SF (renovation)
Cost: $400,000
Completion Date: 2014

Provided critical path schedules for the design team on the Water Meter Integration Project.

Fort HealthCare,
Operating Rooms
Fort Atkinson, WI

Size: 60,000 SF
Cost: $10 Million
Completion Date: 2010

This project included a renovation of the O/R rooms, labs and pharmacy area in the main hospital. Provided Cost Estimating, Budgeting and Change Order Review.

Fort HealthCare,
Campus Regeneration Study
Fort Atkinson, WI

Size: 400,000 SF
Cost: $100 Million
Completion Date: TBD

Provided Conceptual Cost Estimates for the potential re-location of a rural hospital.

St. Joe’s Medical Center
Hobart, Indiana

Size: 60,000 SF
Cost: $23 Million
Completion Date: 2015

Provided Feasibility Studies and Cost Engineering Solutions for the expansion of the facilities operating and emergency departments.